Garanti BBVA Bank Technology Campus

Press kit - Press release - Garanti BBVA Bank Technology Campus - ERA Architects

Garanti BBVA Bank Technology Campus

Pendik, Turkey

ERA Architects


Ataşehir, Turkey, 2019-09-21 –
Located between major highways of Istanbul, D-100 and TEM, in the proximity of Sabiha Gökçen Airport in Pendik, Istanbul, the project transforms an old industrial chemical factory land into a technology company campus for one of the most dynamic Turkish banks.Inspired by the natural topography around the site and the desire of creating a clear contrast to the surroundings’ unorganized urban fabric, a crystal volume as the main working environment is lying gently over several artificial hills sheltering various functions such as two 600 and 200 seats auditoriums, educational meeting spaces, cafeterias, lounges on bridges, data center and many other functions. With approximately 142,000 sqm total built area and 51,000 sqm site are, the campus programme is configured into three major sections: a 53,500 sqm open offices, a 16,000 sqm auditorium, educational spaces and cafeterias, a 72,500 sqm for parking, a Tier 4 data center, a sport center, common spaces, archives and service areas.The horizontal floating volume connects the two plots of the site by the introduction of hanged bridges and glazed screen walls over 30 meters spans. The buildings’ main structure is a flat slab concrete system at the offices and exposed frame structure at the lower levels. Along the outer skin, office spaces have been freed out of columns by 4.5 to 11m deep cantilevers. All four office levels are similar. The widest cantilevering areas are supported by large composite beams placed on the roof. The four levels office block stands partially on a transfer structure to enable the widespan volume for the auditorium located within one of the hills.Flexibility and maximizing the daylight is one of the major criteria for the working spaces, the accessibility to the office spaces has been organized through a set of elevated open courtyards where the users circulate and also have the ability to rest and socialize at lounges placed on bridges allowing many surprising views and vistas. The transparency is used to integrate the working spaces with the city, allowing the users to interact and to create different experiences throughout the year.

A strong contrast awaits the user as the elevated horizontal crystal has a sharp and decisive cantilevered appearance from outside reflecting the sky, the landscape and the city yet the inner main axis structured with rather by voids.

The user circulates through the outdoor ground levels following a path which undulates like a creek between the artificial hills as with the ground outdoor levels, the elevated volume has been designed to allow an experience of the journey for the everyday user. Ponds are designed to enhance the cooling effect on the outdoors as well as on the glazed facades to reduce the temperature gain during hot seasons.

The building implements the sustainability principles overall from single and double skin facade systems with dynamic sun shading integrated with lighting, to special heating & cooling systems providing the inner spaces with hundred percent fresh air. The facades have been designed as unitized systems allowing the high quality in terms of heat and acoustic insulation as the site is surrounded by highways with heavy traffic.

During the initial stages of design when the site has been acquired, the old chemical factory has been removed. The soil has been checked further for contamination. The remainings have been dismantled into several different categories and have been sent for recycling and certified. The existing pine trees from the old factory has been kept and few displaced into newer locations within the site. The rainwater harvesting is used for the landscape mainly. The green hills were obtained by a system of cables embedded into the sedum surface from top to bottom of the artificial hills. It is one of the largest green roof system applications in Turkey. The campus has received Leed Gold certificate.

Techincal sheet

Location: Pendik, İstanbul

Concept Design: Ali Hızıroğlu, ERA Architects Architectural: Project Ertun Hızıroğlu, ERA Architects

Interior Design: Midek Mingü

Site Area: 53,000 sqm

Total Construction: Area 142,000 sqm

About ERA Architects

ERA Architects has been working creating architectural solutions since it was established in 1972 in Istanbul, Turkey. ERA’s interdisciplinary method is based on engaging professionals from different areas of expertise in collaborative teamwork and coordinating the business meticulously. The faith in both global design language and local values enables ERA to find sustainable solutions with international collaborations. ERA Architects has been practicing architecture in the light of these values in Paris since 2000, in Beijing since 2011 and in Moscow since 2018 alongside with the head office in Istanbul. ERA aims to provide the highest quality of architecture for every single project with an innovative design-oriented approach responding to the environment in terms of function, aesthetics and social values.

Garanti BBVA Bank Technology Campus
Video credit:
ERA Architects

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal Emden Photo credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: Cemal EmdenPhoto credit:
Cemal Emden

 

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: ERA Architects

Photo credit:
ERA Architects

 

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: ERA ArchitectsPhoto credit:
ERA Architects

 

Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: ERA Architects


Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: ERA Architects


Press kit | 4078-01 - Press release | Garanti BBVA Bank Technology Campus - ERA Architects - Institutional Architecture - Photo credit: ERA Architects

Photo credit:
ERA Architects

 

Source link

Save This Post
Please login to bookmarkClose

Up Next

RECOMMENDED